5/21/03

The steel I-beams and poles have been delivered.  Also, the outline of the garage has been laid in block!

 

5/23/03

The plastic is down...

 

5/27/03

And (most of) the poles and the steel i-beams are in.  (There is one more pole and i-beam going in, which runs next to the basement stairs.)

 

5/28/03

Most of the tji joists are in for the first floor, and the electric meter box (though not the meter) with 2 grounding rods is installed.  (That's the framing around the basement stairs that you see in the middle picture.)

 

5/29/03

And now the first floor flooring is going in - tongue and groove plywood - no particle board!

 

 

5/30/03

Getting ready to put the walls up, including the bay window in the living room...