The steel I-beams and poles have been delivered. Also, the outline of the garage has been laid in block!
The plastic is down...
And (most of) the poles and the steel i-beams are in. (There is one more pole and i-beam going in, which runs next to the basement stairs.)
Most of the tji joists are in for the first floor, and the electric meter box (though not the meter) with 2 grounding rods is installed. (That's the framing around the basement stairs that you see in the middle picture.)
And now the first floor flooring is going in - tongue and groove plywood - no particle board!
Getting ready to put the walls up, including the bay window in the living room...